Mobile phone mast upgrade

A mobile network operator needed to upgrade a mobile phone mast in Central London. The project required all existing cabling in and around the site to be exposed.

To minimise traffic disruption the work was undertaken at night. Proximity to other buildings and assets required fine movement control of the vacuum excavator’s nozzle. To achieve this, a Mega Arm was used.

Other Case Studies

Utilities